First, identify which notice you have

Go by the letter in hand, not by the old “40-year” nickname. The most common documents are: a Miami-Dade Notice of Required Inspection or Notice of Required Recertification (Chapter 8-11); a Miami-Dade referral to the Unsafe Structures Section, Notice of Violation, posting, or Unsafe Structures Board action; a Miami-Dade Notice of Intent to Disconnect Electrical Utilities; a Broward Notice of Required Building Safety Inspection (BSIP), which older letters may still call “40-year recertification”; a city code-enforcement, Special Magistrate, or unsafe-structure notice in a Broward municipality; or a statewide milestone inspection notice under s. 553.899, which is a different law covered on our milestone pages. Have the notice date, property address, folio or case number, and any prior reports ready.

What to do this week

  1. Read the notice and calendar the date on the letter. Do not assume you still have the original 90 or 180 days if that window has already passed.
  2. Confirm the jurisdiction: unincorporated Miami-Dade or a Miami-Dade municipality, or which Broward city accepted (or should have accepted) the filing.
  3. Gather any existing structural or electrical reports, permits, and correspondence.
  4. If no current report exists, arrange the required structural and electrical inspections right away so a report or extension request can be filed.
  5. If a report already exists and repairs were required, check permit status and start or resume permitted work. An amended closeout report will be needed.
  6. If the letter offers an extension, a signed and sealed statement that the building is safe to occupy may be required. Extensions are not automatic.
  7. Call the official contact on the notice. For Miami-Dade recertification, the county lists 786-315-2373; for Unsafe Structures cases, its recertification portal lists 786-315-2424. Then call 1-800-903-8805 if you want our team to handle the inspection, filing, and repairs.

Miami-Dade: the 90-day report deadline and what “missed it” means

  • The rule: Recertification is required under Section 8-11(f) of the Code of Miami-Dade County. The county’s Building Recertification Portal states that buildings become subject at 30 years for inland buildings and 25 years for coastal buildings, then every 10 years, and that the Code provides 90 days to submit the required report.
  • Exemptions: The county’s recertification page lists single-family homes, duplexes, and buildings with an occupant load of 10 or less and 2,000 square feet or less.
  • Who prepares the report: A Florida-registered professional engineer or architect, who must certify that the building is structurally and electrically safe, or has been made so, for continued occupancy.
  • Timely filing window: A report is deemed timely if it is submitted any time from two years before the recertification anniversary through 90 days after the Notice of Required Inspection, including any official extension.
  • Repairs and permits, 150 days (not 180): If repairs or modifications are needed, the owner has 150 days from the date of the Notice of Required Inspection to complete repairs that do not require permits and to obtain any necessary permits. Permitted work then follows the timeline in the active permit.
  • Where 180 days does apply in Miami-Dade: When repairs are required, the professional who performed the inspection must give the building official a letter stating whether the building may remain occupied during repairs. That letter is valid for no more than 180 days and must be renewed if work is still underway.
  • Extensions, up to 60 days: The building official may grant an extension of not more than 60 days to submit the report or to obtain necessary permits, on a written request from an engineer or architect that includes a signed and sealed statement that the building may continue to be occupied.
  • If the report is not filed and no extension is sought: Per the county portal, the property is referred to the Unsafe Structures Section and an enforcement case is opened. That section may post the building unsafe, issue a Notice of Violation, refer the case to the Unsafe Structures Board, review Board Order timelines for compliance and repairs, issue orders to vacate, collect enforcement costs, and take other action it deems necessary.
  • Electrical utilities: In defined circumstances, Section 8-11(f) allows the building official to order electrical utilities disconnected if the failure to file creates uncertainty about safe occupancy. That can only follow certified-mail and posted notice, with a posting period of at least 5 business days, and a signed and sealed statement that the building may remain occupied is one of the listed ways to stop a disconnection. Treat any notice of intent to disconnect as urgent.
  • Older buildings and deadline groups: Buildings built on or before 1982 generally stay on their established 40-year, then every-10-years schedule. Later buildings moved to the 30-year and 25-year coastal rules, with earlier deadline groups that were supposed to file by December 31, 2024. Check your notice and the Miami-Dade Building Recertification Portal for your building, and see our recertification page for the full schedule.

Broward: the 180-day BSIP clocks and city enforcement

  • The program: Broward’s Building Safety Inspection Program (BSIP) runs under BORA Policy #05-05, starting at 25 years and then every 10 years. Many notices and searches still say “40-year recertification.”
  • Report clock: 180 days from receipt of the Notice of Required Inspection, with a possible building official extension of not more than 60 days.
  • Repair clock: 180 days from the date of the inspection report, unless the building official specifies otherwise, to complete required structural and electrical repairs.
  • Missing the report deadline: The building official shall take the failure to a Special Magistrate or Code Enforcement Board under Chapter 162, Florida Statutes. Failure to complete required repairs, or to submit proof that repairs have been scheduled or commenced in time, can lead to the structure being deemed unsafe and unfit for occupation.
  • Enforcement is local: In Broward, each city (Fort Lauderdale, Sunrise, Hollywood, Pompano Beach, and others) handles its own filings and cases. Ask your city building department where your file stands.
  • State complaint: Broward policy also allows the building official to file a complaint with the DBPR Division of Condominiums, Timeshares, and Mobile Homes if an owner fails to complete the inspection.

For the full program, including exemptions and report requirements, see our Broward Building Safety Inspection (BSIP) page. Source: BORA Policy #05-05.

How this is different from a failed milestone inspection

A missed recertification or BSIP filing deadline is a local program-compliance problem. A milestone Phase 1 finding of “substantial structural deterioration” is a different, statewide process under s. 553.899, Florida Statutes: Phase 2, then repairs scheduled or commenced within 365 days after the local agency receives the Phase 2 report. See our SB 4-D milestone inspection page and what happens if your condo fails its milestone inspection.

What to have ready when you call

Balconies on the front of a mid-rise condominium building

The letter itself, with its date. Go by the letter, not by the old “40-year” nickname.

Side exterior of a mid-rise condominium building with stacked balconies

The property address and the folio or case number on the notice.

Open electrical panel examined during an electrical recertification inspection

Any earlier structural or electrical recertification or Building Safety Inspection reports.

Fresh concrete patch repair above a window on a stucco building wall

Open permits, repair records, and any letters from the county, the city, or the Unsafe Structures Section.

How our engineering team and construction team close the file

1. Notice and case review

We confirm which county and city have jurisdiction, which clock applies, and what has already been filed.
Balcony column marked with orange paint where the inspection flagged a concrete condition

2. Inspection or report review

Our engineering team performs the required structural and electrical inspections, or reviews an existing report.
Close-up of deteriorated concrete and a corroded steel bar inside a spalled column

3. Report, extension, or occupancy letter

We prepare the signed and sealed report and, if appropriate, a written extension request or occupancy letter.
Crack with rust staining on the underside of a concrete slab, documented for the structural report

4. Repair design, permits, and construction

Our engineering and construction teams design, permit, and build the repairs the report requires.
Concrete beam repair in progress with the damaged area cut out and the surrounding stucco masked

Have a Notice or a Missed Deadline?

Call this week and bring the notice. Our engineering team will review which county and which clock apply and recommend the next step.
1-800-903-8805
1-800-903-8805

Send Us Your Notice

Request a Free Quote
1/2
Request a Free Quote
Property Type:
Address:
Service Needed:
2/2
Thanks! I have received your form submission, I'll get back to you shortly!
Oops! Something went wrong while submitting the form

Recertification violations and missed deadlines: frequently asked questions

What happens if we missed the 90-day Miami-Dade recertification deadline?

Miami-Dade’s official recertification portal states that if the owner does not obtain recertification in the required time, the property is referred to the Unsafe Structures Section and an enforcement case is opened. That section can post the building unsafe, issue a Notice of Violation, refer the case to the Unsafe Structures Board, set repair or vacate timelines, and collect enforcement costs. Call the number on your notice, and get the required structural and electrical report or a valid extension request moving immediately.

Is the deadline 90 days or 180 days?

It depends on the county. In Miami-Dade, the recertification report is due within 90 days of the Notice of Required Inspection. In Broward, the Building Safety Inspection report is due within 180 days of the notice. Do not apply one county’s clock to the other.

Can we get an extension?

In Miami-Dade, the Building Official may grant an extension of not more than 60 days to submit the recertification report or to obtain necessary permits, if a written request from an engineer or architect includes a signed and sealed statement that the building may remain occupied. In Broward, the Building Official may grant an extension of not more than 60 days to submit the BSIP report, and a separate short extension may be available to obtain repair permits. Extensions are not automatic.

We missed the deadline years ago under the old 40-year rule. Does that still matter?

Yes. The program names have changed (Miami-Dade recertification is now generally a 30-year / 25-year coastal cycle, and Broward BSIP starts at 25 years), but a missed filing can still be an open enforcement or unsafe-structures case. Check the Miami-Dade recertification portal or your Broward city building department for the current case status.

How long do we have to make repairs after a Miami-Dade recertification inspection?

Under Section 8-11(f), the owner has 150 days from the date of the Notice of Required Inspection to finish repairs that do not need permits and to obtain any necessary permits. Permitted work then follows the active permit timeline. A letter stating the building may stay occupied during repairs is valid for no more than 180 days and must be renewed if work is still underway.

How long do we have to make repairs after a Broward BSIP report?

Unless the Building Official sets a different timeframe, you have 180 days from the date of the Building Safety Inspection report to complete the required structural and electrical repairs, with permits as required.

Will the county evict residents or demolish the building automatically?

Not automatically. Those are possible later outcomes in an unsafe-structures or code-enforcement case if required inspections or repairs are not completed. The official Miami-Dade process includes notice, a case, possible posting, Board review, and orders to repair or vacate. The immediate need is to open a path back to compliance with a current report, any required occupancy letter, and a permitted repair plan.

Can the Building Official cut electrical power because we missed recertification?

In Miami-Dade, Section 8-11(f) allows the Building Official to order electrical utilities disconnected, in defined circumstances, if the recertification report was not timely filed and that failure creates uncertainty about safe occupancy. The Official must first give certified-mail and posted notice. A signed and sealed statement that the building may remain occupied is one of the listed ways to stop a disconnection. Take any “intent to disconnect” letter seriously and respond immediately.

Who should we call at the county?

For Miami-Dade recertification submittals, the county lists 786-315-2373 and RER-Recertification@miamidade.gov. For unsafe-structures cases, the recertification portal lists 786-315-2424. In Broward, call the city building department named on your notice. For help with the inspection, filing, and repairs, call Souffront at 1-800-903-8805.

Official sources

Have a Violation or a Missed Deadline?

If you have a violation, an Unsafe Structures notice, or a deadline you have already missed, call 1-800-903-8805 or contact us this week. Bring the notice.