What a Florida milestone inspection is

A milestone inspection is a structural inspection required by section 553.899 of the Florida Statutes. The requirement was created by SB 4-D and later amended, including by SB 154. It covers load-bearing elements and the primary structural members and systems of the building. Its purpose is not to determine whether the building complies with the Florida Building Code or the firesafety code.
It applies to residential condominium and cooperative buildings that are three habitable stories or more in height, as determined by the Florida Building Code.
The first inspection is due by December 31 of the year the building reaches 30 years of age, based on the certificate of occupancy, and every 10 years thereafter.
A local enforcement agency may require the first inspection at 25 years because of local circumstances, including environmental conditions such as proximity to salt water.

Backed by Experience

1,000+
Projects Completed
15+
Years Experience
72 hrs
Report Delivery
99 %
Satisfaction Rate
Our team

Why associations work with us

Souffront Construction & Engineering helps Florida condominium and cooperative boards complete milestone inspections, understand the report, and plan the next steps, including how this work relates to local recertification and a Structural Integrity Reserve Study (SIRS).
Milestone inspection support for condo and co-op boards
General Contractor: CGC1524932
Help planning repairs and next steps after the report
Coordination with Miami-Dade and Broward recertification requirements
Dashboard mockup
Inspection steps

How a milestone inspection works

01

Review the notice

When the local enforcement agency sends written notice that a milestone inspection is required, Phase 1 must be completed within 180 days after the owner receives that notice. We start by reviewing the notice, the certificate of occupancy date, and what the association already knows about the building.

02

Phase 1 visual inspection

Phase 1 is a visual examination of habitable and nonhabitable areas, including the major structural components of the building, and a qualitative assessment of its structural condition. If no substantial structural deterioration is found, Phase 2 is not required.

03

Phase 2 and the inspection report

If Phase 1 identifies substantial structural deterioration, Phase 2 must be performed and may include testing. The inspection report includes a summary of material findings and recommendations and is submitted to the association and the local building official. If Phase 2 is required, a progress report with a timeline is due to the local agency within 180 days after the Phase 1 report is submitted.

04

Owner notice and repairs

Within 45 days after receiving the report, the association must distribute the inspector-prepared summary to each unit owner, post it on the property, and publish the full report and summary on the association website if the association is required to have a website. Repairs for substantial structural deterioration must begin within 365 days after the local enforcement agency receives a Phase 2 report, unless a local ordinance sets an earlier deadline.

After the report

How this differs from local recertification, and how it connects to SIRS

Florida's milestone inspection is a statewide structural requirement. Miami-Dade recertification and Broward's Building Safety Inspection Program are separate local programs. They typically require both structural and electrical reports, can apply to more building types, and follow their own notice and filing rules. In Broward, the program generally starts at 25 years. In Miami-Dade, it generally starts at 30 years, with an earlier 25-year schedule for some coastal condominium and cooperative buildings. See our recertification page for those local programs. A milestone inspection also connects to the Structural Integrity Reserve Study required under section 718.112(2)(g). If a milestone inspection, or a similar local inspection, was performed within the past five years and meets the SIRS requirements, it may be used in place of the visual-inspection portion of the SIRS. An association may also delay a required SIRS for no more than the two consecutive budget years after a milestone inspection in order to focus resources on the repair and maintenance recommendations from that inspection.

Meet Our Inspection Team

Ricardo B.
EIT Project Engineer I
Miguel S.
Director of Inspections
Abel G.
Project Engineer II
Barry B.
Director of Operations

Our Gallery

Florida milestone inspection FAQ

What is a Florida milestone inspection?

A milestone inspection is a structural inspection of a condominium or cooperative building under section 553.899 of the Florida Statutes. It includes load-bearing elements and the primary structural members and systems. It is used to assess the general structural condition of the building and to identify needed maintenance, repair, or replacement of structural components. It is not an inspection to determine compliance with the Florida Building Code or the firesafety code.

Who must have a milestone inspection?

The requirement applies to a building that is three habitable stories or more in height, as determined by the Florida Building Code, and that is subject, in whole or in part, to the residential condominium form of ownership under chapter 718 or the residential cooperative form of ownership under chapter 719. The law does not apply to a single-family, two-family, three-family, or four-family dwelling with three or fewer habitable stories above ground.

When is the first milestone inspection due?

The first inspection must be performed by December 31 of the year in which the building reaches 30 years of age, based on the date the certificate of occupancy was issued, and every 10 years thereafter. If the certificate of occupancy date is not available, the local building official's occupancy record is used. The statute also set earlier initial windows: buildings that reached 30 years of age before July 1, 2022, had to complete the initial inspection by December 31, 2024; buildings that reached 30 years of age on or after July 1, 2022, and before December 31, 2024, had to complete it by December 31, 2025.

Can a local government require the inspection at 25 years instead of 30?

Yes. The local enforcement agency may determine that local circumstances, including environmental conditions such as proximity to salt water, require the first milestone inspection by December 31 of the year the building reaches 25 years of age, and every 10 years thereafter. The current statewide statute does not itself set an automatic 25-year trigger for buildings within three miles of the coastline; that kind of coastal rule may appear in a local program, such as Miami-Dade recertification.

What is the difference between Phase 1 and Phase 2?

Phase 1 is a visual examination of habitable and nonhabitable areas, including the major structural components, and a qualitative assessment of structural condition. Phase 2 is required only if Phase 1 identifies substantial structural deterioration. Phase 2 may include destructive or nondestructive testing as needed to assess areas of structural distress. Substantial structural deterioration means substantial structural distress or weakness that negatively affects the building's general structural condition and integrity. Surface imperfections such as cracks, sagging, leakage, or peeling finishes are not enough by themselves, unless the inspector determines they are a sign of substantial structural deterioration.

Does a milestone inspection include the electrical system?

No. The statewide milestone inspection under section 553.899 is a structural inspection. It does not, by itself, require an electrical inspection. Miami-Dade recertification and Broward's Building Safety Inspection Program are separate local requirements and typically include both structural and electrical reports. An association may owe the statewide milestone inspection and a local recertification at the same time. See our recertification and milestone inspections page for those local programs.

How soon must Phase 1 be completed after a notice?

Phase 1 must be completed within 180 days after the owner or owners of the building receive written notice from the local enforcement agency. Completion means the Phase 1 inspection report has been submitted to the local enforcement agency.

How soon must repairs start after a Phase 2 report?

The association and any other owner subject to the law must schedule or commence repairs for substantial structural deterioration within the time set by local ordinance after the local enforcement agency receives the Phase 2 report. Those repairs must be commenced within 365 days after the agency receives the report, and a local government may require an earlier start. If proof that repairs have been scheduled or commenced is not submitted in time, the local enforcement agency must review whether the building is unsafe for human occupancy.

What must the association tell unit owners?

After the local agency's written notice that an inspection is required, the association must notify unit owners within 14 days and provide the date the inspection must be completed. After the inspection, and within 45 days after receiving the inspection report, the association must distribute the inspector-prepared summary to each unit owner, post a copy in a conspicuous place on the property, and publish the full report and the summary on the association's website if the association is required to have a website. This owner-summary duty applies regardless of the findings in the report.

How is a milestone inspection different from Miami-Dade or Broward recertification?

The milestone inspection is a statewide structural requirement for qualifying condominium and cooperative buildings. Miami-Dade's recertification program and Broward's Building Safety Inspection Program are local programs. They typically require both structural and electrical reports, may apply to more building types, and have their own notice and filing deadlines. Broward's program generally starts at 25 years of age, then every 10 years. Miami-Dade's program generally starts at 30 years, then every 10 years, with an earlier 25-year schedule for some coastal condominium and cooperative buildings.

How does a milestone inspection relate to a Structural Integrity Reserve Study (SIRS)?

They are related, but they are not the same thing. A milestone inspection asks whether the structure shows substantial structural deterioration and what repairs are needed. A SIRS, required under section 718.112(2)(g), estimates remaining useful life, replacement or deferred-maintenance cost, and reserve funding for specified building components. If a milestone inspection, or a similar local inspection, was performed within the past five years and meets the SIRS requirements, it may be used in place of the visual-inspection portion of the SIRS. The association may also delay a required SIRS for no more than the two consecutive budget years immediately following the milestone inspection in order to focus resources on the milestone repair recommendations. More detail is on our SIRS page.

Who is allowed to perform a milestone inspection?

Section 553.899 requires a milestone inspection to be performed by an architect licensed under chapter 481 or an engineer licensed under chapter 471 who is authorized to practice in Florida. The services may be provided by a team of professionals, with an architect or engineer acting as a registered design professional in responsible charge, and with work and reports signed and sealed by the appropriate qualified team member.

To talk with our engineering team about a milestone inspection notice, Phase 1 or Phase 2 work, or how this requirement fits with local recertification, call 1-800-903-8805 or contact us.

Client Testimonials

Souffront Construction went above and beyond to ensure that I recieved the most professionañ service. They assisted me with a certified assessment to submit to the condo board for approval of upgrades to my unit. Communicating with them was easy and timely. I would hire them again.

I have been working with Souffront Engineering for years now and the experience has always been professional, and timely.

Great service!

I have worked with Souffront Construction for about a year now. I highly recommend their services if you’re looking for a contractor that is reliable, knowledgeable, and passionate about what they do.

I cannot begin to say enough great things about Souffront Construction & Engineering.They are professional, attentive, efficient and very professional. I highly recommend Souffront Construction & Engineering.

Souffront Construction went above and beyond to ensure that I recieved the most professionañ service. They assisted me with a certified assessment to submit to the condo board for approval of upgrades to my unit. Communicating with them was easy and timely. I would hire them again.

I highly recommend this company for their exceptional service and professionalism. They demonstrated a strong commitment to quality and attention to detail throughout the entire process. Communication was clear, timely, and consistent both during and after the project. They successfully provided us with building.

Very diligent, quick and responsive service. Accurate and very reasonable. It's great to work with professionals with experience.

Great team , we used this Engineering Company for our building's 50-year recertification. The initial inspection was performed professionally , very much attention to all the details , and their reinspection was beyond . They stand behind their work . They are prompt and efficient . I extremely recommend this Company
Hide

I have worked with Souffront Construction for about a year now. I highly recommend their services if you’re looking for a contractor that is reliable, knowledgeable, and passionate about what they do.

Kudos to John and his team for the amazing work they did at our property. The team is very professional and they know what they are talking about. Highly recommended.

Professional, knowledgeable & just a great team to work with. A++ services.

Excellent Experience with Souffont Construction & Engineering!!!! The whole team was very knowledgeable and supportive and led me step by step through the process of a 40 year certification on a commercial building. They are very fast and responsive and were able to assist my colleague with obtaining a proposal on a large construction project aswell in less than a week!!!!

Souffront Construction went above and beyond to ensure that I recieved the most professionañ service. They assisted me with a certified assessment to submit to the condo board for approval of upgrades to my unit. Communicating with them was easy and timely. I would hire them again.

Excelent service

I'm a property manager of about 200 units. I've worked with Souffront Constructions for almost two years. They are very professional, cost effective and time efficient. I strongly recommend them.

John provided details and reviewed our home we were planning to purchased. Its was great to working with him.

Souffront Construction & Engineer Great service & they responded quickly to any concerns to there Service and Answered all my questions promptly by the way John was Great customer service !”

Amazing work ethic. Working with Jhon was an absolute pleasure to work with.

Our Condo Association has hired Souffront Engineering and Construction to do repairs to our buildings on several occasions. The work is always done in a thorough and professional manner and at a competitive price.

Souffront Construction & Engineering can be relied on to provide a professional and thorough service. Our condo association hired John Souffrant and his team to inspect our buildings for concrete work and water intrusion. We are pleased with the quality workmanship and professionalism of the team. We will reach out to Souffrant Construction for future needs.

Great Service. Very professional and honest.

Very professional. John is excellent at what he does.

Souffront Construction went above and beyond to ensure that I recieved the most professionañ service. They assisted me with a certified assessment to submit to the condo board for approval of upgrades to my unit. Communicating with them was easy and timely. I would hire them again.

Souffront Contruction team... Can't be better. Facts: John solved my doubts on some cracks on the garage floor over the phone first time I called him, not even charging me any money. Second time I called they came on a 24 hour turnover to check if a wall was load bearing, Guillermo came, another excellent person. This company is Honest and Professional, that is what I was looking for. Thank you.

Had a leaky pipe emergency. Souffrant was responsive, communicative and did careful work in exposing the pipe with minimal disruption. When the pipe was repaired they restored everything beautifully. They are skilled they are caring. I trust them with my home.

I got my job done from Souffront Construction. I was so happy with the quality of service that I received.

John and his crew were awesome. 40 yr certification inspection was done and they accommodated us within the time we needed done. Very responsive every time you contact them. Definitely recommend.

We hired Suffront construction for 40 year certification in Miami Fl. We are very happy with their prompt services & staff. we highly recommend them. Thank you John.

It’s a real pleasure to work with Souffront, the experience has been according to expectations, professionalism and quality through all the process. There is no doubt that we have planned to work in future projects together. Thanks for the amazing job performed and for the opportunity to work with you.

Contact us

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.